top of page

DAILY LOG

JANUARY 23, 2015

TODAY WE WERE INFORMED THAT WE ARE MAKING A BLOG IN 9 WEEKS. aLSO WE WORKED MORE ON OUR CATAPULT PROJECTS. THE MOST DIFFICULT THING ABOUT TODAY WAS FINDING A SKETCH THAT WE WERE GOING TO MAKE INTO A CATAPULT. WE DIDN'T LEARN MUCH BECAUSE IT WAS A WORK DAY .

JANUARY 27, 2015

TODAY EVERYONE STARTED ON THEIR FULL SCALE DRAWINGS TODAY, WE DID NEED MORE TIME FOR THE TIME WE WERE GIVEN BUT WE WILL START OUR BUILDING NEXT CLASS. tHE MOST DIFFICULT IS DRAWING THE CATAPULTS TO A SIZE I WANTED AND FINDING THE RIGHT DESIGN TO DO. WE DIDN'T LEARN MUCH TODAY BECAUSE IT WAS A WORK DAY.

JANUARY 29, 2015

tHIS CLASS WE STARTED TO GO OVER THE DIFFERENT PROCESSES AND HOW THEY WOULD AFFECT OUR PROJECT.  WE STARTED TO RESEARCH DIFFERENT DESIGNS FOR THE CATAPULT. THE MOST DIFFICULT THING ABOUT THIS WAS THE CATAPULT ALL LOOK VERY SIMILAR AND EASY TO DO. WE DIDN'T LEARN MUCH DURI NG THE CLAS BECAUSE WE START THE PROJECT.
 

FEBUARY 2 2015

THIS CLASS WE WENT OVER WHICH CATAPULT WE WERE ACTUALLY GOING TO DO. WE ALSO LEARNED HOW DIFFICULT IT WOULD BE TO CHANGE THE TRJECTORY OF THE CATAPULT TO ADJUST THE DISTANCE EACH TIME. THE HARDEST PART ABOUT THE PROJECT WAS PICKING A CATAPULT AND EXPLAINING HOW IT WAS GOING TO WORK.
 

FEBRUARY 6 2015

THIS CLASS WE WENT OVER TESTING AND REFINING THE PROJECT. WE HAVE JUST STARTED BUILDIN THE CATAPULT AND GETTING THEM APPROVED. TODAY WAS MOSTLY A WORK DAY. 
 

FEBRUARY 9 2015

TODAY WAS MOSTLY A WORK DAY. I RAN INTO A PROBLEM WHEN I DIDN'T REALIZE THAT I HAD TO ADJUST MY PROJECT AND THEN I HAD TO RESTART. ALSO WHEN DOING MY PROJECT I HAD TO THROW ONE OF MY IDEAS AWAY WHEN NOVITSKI TOLD ME THAT THE SPOON WOULDN'T WORK.
 

FEBRUARY 11 2015

TODAY WAS A WORK DAY. I WAS STILL WORKING ON MY PROJECT, I WAS CONFUSED ON HOW WAS TO GO ABOUT DRILLING 3/8 INCH HOLE IN A POPSICLE STICK BUT IT ENDED UP WORKING. GETTING THE HOLES EVEN WAS A PROBLEM AND USE THE WRONG WIDTH WHEN I DID DRILL BEFORE HAND.
 

FEBRUARY 20 2015

TODAY WAS ALSO A WORK DAY. WE WENT OVER THAT FACT THAT WE HAVE TO TAKE A MID TERM MARCH 3RD AND WHAT WAS ON THE TEST. i WAS STILL BUIDING A FINDING DIFFICULTY DRILLING THE HOLE IN THE STICKS AND NOT HAVING A RUBBERBAND.
 

MARCH 3 2015

today we took our midterm, after we were finished we were able to finish our reflection and complete 2.3.3 on our wix account. We didn't learn much today since we were testing for most of the time. the most difficult part of lass was atually taking the test and being prepared for the questions even though we had notes.

 

 
 

Title. Double click me.

bottom of page